Skip to content

Cleaver Brooks Representative

Vapor Power Representative

Waterloo Manufacturing

City Hospital Boiler Upgrade

City HospitalNew York, NY May, 2024June, 2024
Scope of work

Installation of 3 EcoHeat SB-800X system boilers, decommissioning old units, and optimizing the heating controls to match hospital energy needs.

Special Requirements

Hospital staff required minimal disruption during installation, and the system needed to integrate seamlessly with existing hospital management software.

City Hospital required an upgraded heating system to improve energy efficiency and reduce operational costs. The project involved replacing outdated boilers with new high-efficiency units.

Product Information
  • Type
    System Boiler
  • Model
    SB-800X
  • Capacity
    150 kW
  • Fuel Type
    Gas

See the difference

Installation Gallery

Performance & Result
  • Efficiency 92% efficiency, resulting in a significant reduction in energy consumption.
  • Annual Savings $15,000 in fuel costs.
Installation Challenges

The installation was challenging due to limited space in the boiler room, requiring custom fittings.

System Integration

Integrated with the hospital’s existing control system for temperature regulation and monitoring.

Product Categories