Commercial Boiler Installation for Office Tower
Full system design, installation of PureFlow CB-7000, and ensuring seamless integration with the building’s HVAC system.
High heating load due to multiple floors and large office spaces.
Installation of a high-capacity conventional boiler to provide heating for a multi-floor office building, reducing heating costs and improving energy efficiency.
Project Categories or Tags
Project Category: Conventional Boilers, Commercial Services
Project Tags: High-capacity boiler, commercial heating, energy efficiency
Key Metrics
Project Cost: $250,000
Energy Savings: 120,000 kWh annually
- Type
Conventional Boiler - Model
CB-7000 - Capacity
500 kW - Fuel Type
Natural Gas
- Efficiency 90% efficiency.
- Annual Savings $40,000 in energy costs.
Tight space in the mechanical room required creative piping solutions.
Integrated with existing building management system (BMS) for temperature monitoring.
Feedback
“The new system is a major improvement. It’s more efficient and helps reduce our utility costs significantly.”
Client Rating: 5/5
— Facility Manager, City Hospital
