Skip to content

Cleaver Brooks Representative

Vapor Power Representative

Waterloo Manufacturing Headquarters
Waterloo Manufacturing

Commercial Boiler Installation for Office Tower

GreenTech OfficesChicago, IL July, 2024August, 2024
Scope of work

Full system design, installation of PureFlow CB-7000, and ensuring seamless integration with the building’s HVAC system.

Special Requirements

High heating load due to multiple floors and large office spaces.

Installation of a high-capacity conventional boiler to provide heating for a multi-floor office building, reducing heating costs and improving energy efficiency.

Project Categories or Tags

Project Category: Conventional Boilers, Commercial Services

Project Tags: High-capacity boiler, commercial heating, energy efficiency

Key Metrics

Project Cost: $250,000

Energy Savings: 120,000 kWh annually

Product Information
  • Type
    Conventional Boiler
  • Model
    CB-7000
  • Capacity
    500 kW
  • Fuel Type
    Natural Gas

See the difference

Installation Gallery

Performance & Result
  • Efficiency 90% efficiency.
  • Annual Savings $40,000 in energy costs.
Installation Challenges

Tight space in the mechanical room required creative piping solutions.

System Integration

Integrated with existing building management system (BMS) for temperature monitoring.

Product Categories

Target Industries